Project: Greg's_RV-10   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Greg Kochersperger   -  
Project:   Vans - RV-10
Total Hours:1320.9
Total Flight Time:1.1
Start/Last Date:Jan 15, 2021 - No Finish Date
Engine:IO-540
Propeller:TBD
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=Greg's_RV-10

Home or Last Project Picture

Mar 27, 2021     8-2 & 8-5: HS spar work - (3.1 hours)       Category: 8: Horiz Stab
Trying to get both spars to the point of priming so I can do them at the same time. Put in a good day today but not quite there.

Rear spar was pretty easy. Just some match drilling of elevator brackets and some counter sinking. The front spar is a bear though. A lot of drilling for the spar caps. I know I'm going to have to come back and counter sink all of those holes too. It's just like the vertical stab spar, only twice as long.

The majority of the time today was just on one step. Parts are getting larger, steps are taking longer.


 